Renewal Call for identification of investors for Completion of a section of wastewater system in Malardcity through Buyback contract ۹۵/t18 In the context of item (e) Clause 19 of the Budget Act for the year 1394 (2015-2016), and Guideline 27 of the Law for annexation of some articles to the law on drafting part of […]
Renewal Call for identification of investors for
Completion of a section of wastewater system in Malardcity through Buyback contract
۹۵/t18
In the context of item (e) Clause 19 of the Budget Act for the year 1394 (2015-2016), and Guideline 27 of the Law for annexation of some articles to the law on drafting part of thegovernment’s financial regulations (2) on conditions for concession of new, half-complete, completed and ready for operation capital asset acquisition plans to private sector (approved on26th September 2015), West Town and Townships of TehranWater and Wastewater company intends to concede thecompletion of a section of the wastewater collection and treatment system in Malardcity against the allocation of the determined volume of treated effluent for specific use for a limited andpredetermined period through Buyback contract according to the following conditions to aqualified investor.
A- Brief description of the project:
– Subject: Completion of about 90 Km sewage system and transfer line implementationin Malardcity
– Concessioner: The West Town and Townships of TehranWater and Wastewater Company
– Consultant: :Pars AbTadbir Consultant Engineers Company
– Construction period: 3 years
– Commercial operation period: Financial model to be submitted
– Treatment efficiency: The specifications oftreatment plant’s effluentmust comply with the latest DoE (Department of Environment) standards of country for discharge to underground waters.
– Population coverage: 235000 people
– Project site: Malardcity
B- General conditions for investment:
– Grades required: having grade2 in the field of water of non-industrial EPC or a contractor that has grade3 in the field of water along with introducing a consultantwith grade 3 in water and wastewater facilities which has adequate experiences in design and supervision of at least 2 sewage collection networksand transfer lines with the same scope.
– The investor must be a real or legal entity in possession of acceptable managementexperience to ensure and allocate the required investment.
Required documents for receiving prequalification documents: a- introduction letter, b-Bank receipt pay IRR 1,000,000 to the Tehran ‘s west cities and towns Water and Wastewater Company account No. 117-4-60000000-1 at Sina Bank, Ekbatan Branch.
– Date, deadline and address to collect the qualification documents: Qualified in vestorsmay submit their letter of intent for investment in the plan and collect the qualificationdocuments from (saturday)2016/23/07 until the end of office hours on(sunday) 2016/31/07 from: Central secretariat of West Town and Townships of TehranWater and Wastewater Company, next to First Street West, Shahid Ali Rasekhmehr Street, Central Tehransar, 7th Special Road Of Karaj, Tehran city, Iran.
– Address and deadline for submission of the required documents: The completedevaluation forms should be submitted at 15.00 on (Wednesday) dated 2016/31/08 to: Central secretariat of West Town and Townships of TehranWater and Wastewater Company, next to First Street West, Shahid Ali Rasekhmehr Street, Central Tehransar, 7th Special Road Of Karaj, Tehran city, Iran.
– Following the review of the evaluation documents submitted by the interested parties, thequalified investors shall be invited for contract negotiations.
– The concessioner has the right to accept or reject the technical or financial proposals ofthe investors at any stage of the proceedings.
این مطلب بدون برچسب می باشد.